Index of /ASC_Previous_Problems/Open/IP/2018/Specifications/VOLUME 2
Name
Last modified
Size
Description
Parent Directory
-
21 00 10 - General Requirements - Copy.pdf
05-Oct-2018 15:10
650K
21 00 20 - Fire Suppression Scope of Work.pdf
05-Oct-2018 15:10
81K
21 05 07 - Design Conditions.pdf
05-Oct-2018 15:10
47K
21 05 13 - Motor Requirements for Fire Suppression Equipment.pdf
05-Oct-2018 15:10
78K
21 05 48 - Vibration and Seismic Controls for Fire Suppression Piping and Equipment.pdf
05-Oct-2018 15:10
70K
21 05 50 - Access Doors and Color-Coded Identification in General Construction.pdf
05-Oct-2018 15:10
64K
21 05 93 - Testing.pdf
05-Oct-2018 15:10
66K
21 11 00 - Connections to Utilities.pdf
05-Oct-2018 15:10
62K
21 12 00 - Fire Suppression Standpipe Systems.pdf
05-Oct-2018 15:10
133K
21 13 00 - Fire Suppression Sprinkler Systems.pdf
05-Oct-2018 15:10
129K
21 30 00 - Fire Pumps and Controller.pdf
05-Oct-2018 15:10
94K
21 41 00 - Fire Suppression Water Storage Tank.pdf
05-Oct-2018 15:10
57K
22 00 10 - General Requirements.pdf
05-Oct-2018 15:10
198K
22 00 20 - Plumbing Scope of Work.pdf
05-Oct-2018 15:10
109K
22 00 30 - Connections to Utilities.pdf
05-Oct-2018 15:10
65K
22 05 07 - Design Conditions.pdf
05-Oct-2018 15:10
45K
22 05 13 - Motor Requirements for Plumbing Equipment.pdf
05-Oct-2018 15:10
105K
22 05 48 - Vibration Isolation.pdf
05-Oct-2018 15:10
84K
22 05 50 - Access Doors and Color-Coded Identification in General Construction.pdf
05-Oct-2018 15:10
65K
22 05 93 - Testing, Balancing, and Adjusting.pdf
05-Oct-2018 15:10
73K
22 07 00 - Thermal Insulation.pdf
05-Oct-2018 15:10
80K
22 10 00 - Domestic Water Systems.pdf
05-Oct-2018 15:10
140K
22 11 30 - RECYCLED WATER SYSTEMS.pdf
05-Oct-2018 15:10
130K
22 12 00 - Potable Water Storage Tanks.pdf
05-Oct-2018 15:10
62K
22 13 00 - Sewage and Drainage System.pdf
05-Oct-2018 15:10
78K
22 13 26 - Facility Fuel System.pdf
05-Oct-2018 15:10
134K
22 21 23 - Pumps.pdf
05-Oct-2018 15:10
110K
22 30 00 - Plumbing Equipment.pdf
05-Oct-2018 15:10
64K
22 40 00 - Clean-outs, Drains, and Plumbing Fixtures.pdf
05-Oct-2018 15:10
121K
22 63 13 - Natural Gas Systems.pdf
05-Oct-2018 15:10
66K
23 00 10 - General Requirements.pdf
05-Oct-2018 15:10
198K
23 00 20 - HVAC Scope of Work.pdf
05-Oct-2018 15:10
130K
23 05 07 - Design Conditions.pdf
05-Oct-2018 15:10
49K
23 05 13 - Motor Requirements for HVAC Equipment.pdf
05-Oct-2018 15:10
108K
23 05 48 - Vibration Isolation.pdf
05-Oct-2018 15:10
111K
23 05 50 - Access Doors and Color Coded Identification.pdf
05-Oct-2018 15:10
64K
23 05 93 - Testing, Balancing, and Adjusting.pdf
05-Oct-2018 15:10
124K
23 07 00 - Thermal Insulation.pdf
05-Oct-2018 15:10
114K
23 08 00 - HVAC Cx.pdf
05-Oct-2018 15:10
93K
23 21 13 - Pipes Valves Fittings and Accessories.pdf
05-Oct-2018 15:10
200K
23 21 23 - Pumps.pdf
05-Oct-2018 15:10
75K
23 33 19 - Sound Absorbing Sections.pdf
05-Oct-2018 15:10
72K
23 34 00 - Exhaust and Ventilating Fans.pdf
05-Oct-2018 15:10
105K
23 36 00 - Air Terminal Units.pdf
05-Oct-2018 15:10
140K
23 37 00 - Air Distribution Equipment.pdf
05-Oct-2018 15:10
131K
23 40 00 - Air Filtering.pdf
05-Oct-2018 15:10
71K
23 52 16 - Condensing Boilers.pdf
05-Oct-2018 15:10
84K
23 57 19 - Liquid-to-Liquid Heat Exchangers for HVAC.pdf
05-Oct-2018 15:10
70K
23 64 16 - Centrifugal Water Chilling Units.pdf
05-Oct-2018 15:10
127K
23 73 23 - Custom Factory-Built Air Handling Units.pdf
05-Oct-2018 15:10
119K
23 73 63 - Custom Factory-Built Tri-Path Multi-Zone Air Handling Units.pdf
05-Oct-2018 15:10
148K
23 81 21 - Computer Room DX Air Cooled Air Handling Units.pdf
05-Oct-2018 15:10
1.1M
23 81 25 - Computer Room Chilled Water Air Handling Units.pdf
05-Oct-2018 15:10
769K
23 82 19 - Factory-Built Fan Coil Units.pdf
05-Oct-2018 15:10
425K
23 83 05 - Radiant Hydronic Systems.pdf
05-Oct-2018 15:10
90K
25 01 00 BMCS Scope Of Work.pdf
05-Oct-2018 15:10
70K
25 05 00 BMCS General Requirements.pdf
05-Oct-2018 15:10
213K
25 06 00 BMCS Documentation.pdf
05-Oct-2018 15:10
102K
25 07 00 BCMS Testing and Inspections.pdf
05-Oct-2018 15:10
113K
25 08 00 - BMCS Cx.pdf
05-Oct-2018 15:10
61K
25 11 00 BMCS Networks and Workstations.pdf
05-Oct-2018 15:10
106K
25 14 00 BMCS Controllers.pdf
05-Oct-2018 15:10
203K
25 15 00 BMCS Software.pdf
05-Oct-2018 15:10
157K
25 16 00 BMCS Software Interfaces.pdf
05-Oct-2018 15:10
39K
25 30 10 BMCS Field Devices - Electrical.pdf
05-Oct-2018 15:10
89K
25 30 20 BMCS Field Devices - Air.pdf
05-Oct-2018 15:10
186K
25 30 30 BMCS Field Devices - Water.pdf
05-Oct-2018 15:10
138K
25 35 19 BMCS Valves.pdf
05-Oct-2018 15:10
153K
25 35 23 BMCS Dampers.pdf
05-Oct-2018 15:10
97K
25 80 00 BMCS Schedules, Diagrams, and Sequences.pdf
05-Oct-2018 15:10
1.6M
26 00 10 - General Requirements.pdf
05-Oct-2018 15:10
196K
26 00 20 - Scope of Work.pdf
05-Oct-2018 15:10
89K
26 05 11 - Electrical Service.pdf
05-Oct-2018 15:10
50K
26 05 19 - Electrical Conductors - 600 Volts.pdf
05-Oct-2018 15:10
92K
26 05 23 - Motor and Control Wiring Systems.pdf
05-Oct-2018 15:10
61K
26 05 26 - Grounding and Bonding.pdf
05-Oct-2018 15:10
74K
26 05 33 - Raceways and Boxes - Copy.pdf
05-Oct-2018 15:10
501K
26 05 43 - Underground Ducts and Raceways.pdf
05-Oct-2018 15:10
71K
26 05 48 - Vibration and Seismic Controls.pdf
05-Oct-2018 15:10
63K
26 05 50 - Access Doors and Color Coded Identification.pdf
05-Oct-2018 15:10
67K
26 05 73 - Electrical Power System Study.pdf
05-Oct-2018 15:10
90K
26 08 00 - Electrical Cx.pdf
05-Oct-2018 15:10
58K
26 08 13 - Testing.pdf
05-Oct-2018 15:10
68K
26 09 50 - Sub-Metering Systems.pdf
05-Oct-2018 15:10
63K
26 09 60 - Lighting Controls Systems Integration.pdf
05-Oct-2018 15:10
22K
26 22 13 - Low-Voltage Dry-Type Distribution Transformers.pdf
05-Oct-2018 15:10
68K
26 22 14 - Harmonic Mitigating Transformers (HMT).pdf
05-Oct-2018 15:10
77K
26 24 13 - Switchboards - 600 Volts.pdf
05-Oct-2018 15:10
99K
26 24 16 - Panelboards.pdf
05-Oct-2018 15:10
70K
26 25 00 - Busways.pdf
05-Oct-2018 15:10
108K
26 27 26 - Wiring Devices.pdf
05-Oct-2018 15:10
66K
26 28 13 - Fuses.pdf
05-Oct-2018 15:10
53K
26 28 16 - Enclosed Switches and Circuit Breakers.pdf
05-Oct-2018 15:10
64K
26 29 13 - Enclosed Controllers.pdf
05-Oct-2018 15:10
69K
26 32 13 - Engine Generators.pdf
05-Oct-2018 15:10
115K
26 32 15 - natural gas microturbines - Copy.pdf
05-Oct-2018 15:10
475K
26 36 23 - Automatic Transfer Switches.pdf
05-Oct-2018 15:10
76K
26 41 13 - Lightning Protection System.pdf
05-Oct-2018 15:10
54K
26 43 13 - Surge Protection Devices.pdf
05-Oct-2018 15:10
77K
26 50 10 - Architecctural Lighting Fixtures Lamps Ballasts.pdf
05-Oct-2018 15:10
67K
26 51 13 - Lighting Fixtures and Lamps.pdf
05-Oct-2018 15:10
69K
26 55 13 - Architectural Lighting Fixtures.pdf
05-Oct-2018 15:10
48K
26 70 00 - Telecommunication System.pdf
05-Oct-2018 15:10
49K
28 13 00 - SMS.pdf
05-Oct-2018 15:10
428K
28 31 10 - FDAC General Requirements.pdf
05-Oct-2018 15:10
170K
28 31 20 - FDAC Scope of Work.pdf
05-Oct-2018 15:10
74K
28 31 30 - FDAC System.pdf
05-Oct-2018 15:10
116K
28 31 40 - FDAC Testing.pdf
05-Oct-2018 15:10
52K
31 00 00 - Earthwork - Copy.pdf
05-Oct-2018 15:10
76K
31 23 00 - Excavation and Fill.pdf
05-Oct-2018 15:10
3.4K
31 23 19 - Dewatering - Copy.pdf
05-Oct-2018 15:10
48K
31 23 33 - Trenching and Backfilling.pdf
05-Oct-2018 15:10
3.3K
31 50 00 -Excavation Support System - Copy.pdf
05-Oct-2018 15:10
76K
31 63 33_Drilled Micropiles-20140502.pdf
05-Oct-2018 15:10
48K
31 66 16_LoadBearingElements-20140502.pdf
05-Oct-2018 15:10
34K
32 01 90 Landscape Maintenance Period.pdf
05-Oct-2018 15:10
37K
32 05 23 - Cement and Concrete.pdf
05-Oct-2018 15:10
3.3K
32 11 00 - Base Courses.pdf
05-Oct-2018 15:10
3.4K
32 11 23 Landscape Aggregate Base Course.pdf
05-Oct-2018 15:10
27K
32 12 00 - Flexible Paving.pdf
05-Oct-2018 15:10
3.3K
32 14 40 - Sand and Mortar Set Paving.pdf
05-Oct-2018 15:10
38K
32 16 13 - Concrete Curbs and Gutters.pdf
05-Oct-2018 15:10
3.4K
32 17 13 - Parking Accessories.pdf
05-Oct-2018 15:10
22K
32 17 23 - Pavement Markings.pdf
05-Oct-2018 15:10
24K
32 34 10 - Geosynthetic Fill .pdf
05-Oct-2018 15:10
42K
32 84 00 - Planting Irrigation.pdf
05-Oct-2018 15:10
50K
32 91 13 - Planting Soil Preparation .pdf
05-Oct-2018 15:10
44K
32 91 30 - Planting Area Finish Grading.pdf
05-Oct-2018 15:10
25K
32 92 10 - Contract Growing and Maintenance.pdf
05-Oct-2018 15:10
46K
32 93 00 - Planting Materials.pdf
05-Oct-2018 15:10
39K
32 94 53 - Modular Suspended Pavement System.pdf
05-Oct-2018 15:10
88K
33 05 13 - Manhole Grade Adjustment.pdf
05-Oct-2018 15:10
3.3K
33 05 16 - Utility Structures.pdf
05-Oct-2018 15:10
3.3K
33 10 00 - Water Utilities.pdf
05-Oct-2018 15:10
3.4K
33 30 00 - Sanitary Sewer Utilities.pdf
05-Oct-2018 15:10
3.5K
33 41 19 - Landscape Drainage.pdf
05-Oct-2018 15:10
38K
34 14 13 - Aerial Tramway General Requirements 20140502.pdf
05-Oct-2018 15:10
30K
34 14 14 - Aerial Tramway Ropeway Equipment 20140502.pdf
05-Oct-2018 15:10
41K
34 14 15 - Aerial Tramway Electrical 20140502.pdf
05-Oct-2018 15:10
55K
34 14 16 - Maintenance Specifications - 20140502.pdf
05-Oct-2018 15:10
42K
COVER SHEET - 140502 - Issued for GMP - VOLUME 2.pdf
05-Oct-2018 15:10
18K
TOC - 140502 - Issued for GMP.pdf
05-Oct-2018 15:10
112K
Apache/2.2.34 (Amazon) Server at asc67.org Port 80