Index of /ASC_Previous_Problems/R7/Commercial/2013 Region 7 Commercial Problem HP/Solution Files

[ICO]NameLast modifiedSizeDescription

[DIR]Parent Directory  -  
[   ]X.0.a Answer Statement.pdf05-Mar-2019 17:56 725K 
[   ]X.1.a Financial Status Report.xls05-Mar-2019 17:56 139K 
[   ]X.1.b Email to Operations Manager.pdf05-Mar-2019 17:56 48K 
[   ]X.2.a Change Estimate Part A.xls05-Mar-2019 17:56 80K 
[   ]X.2.b Flow Construction Co Part A.xlsx05-Mar-2019 17:56 14K 
[   ]X.2.c Wall Contractors Inc Part A.xls05-Mar-2019 17:56 71K 
[   ]X.2.d Ignite Brothers Part A.doc05-Mar-2019 17:56 53K 
[   ]X.2.e Change Estimate Part B.xls05-Mar-2019 17:56 82K 
[   ]X.2.f Flow Construction Co Part B.xls05-Mar-2019 17:56 31K 
[   ]X.2.g Wall Contractors Inc Part B.xls05-Mar-2019 17:56 71K 
[   ]X.2.h Ignite Brothers Part B.doc05-Mar-2019 17:56 55K 
[   ]X.3.a Concrete Estimate Spreadsheet ANSWER.xls05-Mar-2019 17:56 155K 
[   ]X.4.a General Conditions Spreadsheet.xlsx05-Mar-2019 17:56 46K 
[   ]X.4.b Staffing Matrix.pdf05-Mar-2019 17:56 59K 
[   ]X.4.c Staffing Responsibilities.pdf05-Mar-2019 17:56 33K 
[   ]X.5.a Drywall, Frame, Insul, FP.pdf05-Mar-2019 17:56 73K 
[   ]X.5.b Ornamental Railings Proposal Summary.pdf05-Mar-2019 17:56 74K 
[   ]X.5.c Epoxy Flooring Proposal Summary.PDF05-Mar-2019 17:56 55K 
[   ]X.5.d Millwork Proposal Summary.pdf05-Mar-2019 17:56 23K 
[   ]X.5.e Landscaping & Irrigation Proposal Summary.PDF05-Mar-2019 17:56 44K 
[   ]X.6.a Complete CPM Schedule.pdf05-Mar-2019 17:56 1.1M 
[   ]X.6.b Milestone Report.pdf05-Mar-2019 17:56 83K 
[   ]X.6.c Primary Critical Path Report.pdf05-Mar-2019 17:56 157K 
[   ]X.6.d Secondary Critical Path Report.pdf05-Mar-2019 17:56 129K 
[   ]X.6.e Schedule Answer Letter.pdf05-Mar-2019 17:56 81K 
[   ]X.7.a Short Interval Production Schedule.pdf05-Mar-2019 17:56 46K 
[   ]X.9.a Toolbox Meeting Agenda.pdf05-Mar-2019 17:56 38K 
[   ]X.9.b Job Hazard Analysis.pdf05-Mar-2019 17:56 101K 
[   ]X.10.a Site Utilization Plan.pdf05-Mar-2019 17:56 891K 
[   ]X.10.b Site Utilization Plan Addendum.pdf05-Mar-2019 17:56 894K 
[   ]X.10.c Traffic Control Plan.pdf05-Mar-2019 17:56 894K 
[   ]X.11.a Letter to Sup. Answer.pdf05-Mar-2019 17:56 61K 
[   ]X.11.b Placement Check Card.pdf05-Mar-2019 17:56 157K 
[   ]X.11.c Wall Lift Drawing.pdf05-Mar-2019 17:56 207K 