Index of /ASC_Previous_Problems/R7/Commercial/2022 Region 7 Commercial Problem HP/Answer Statement Attachments

[ICO]NameLast modifiedSizeDescription

[DIR]Parent Directory  -  
[   ]X.0.0 Region 7 Commercial Answer Statement - Final.pdf18-Dec-2022 13:31 6.3M 
[   ]X.1.1.a - Financial Status Report.pdf18-Dec-2022 13:31 142K 
[   ]X.10.A.a - RCC Sewer Line Install Answer.pdf18-Dec-2022 13:31 7.3M 
[   ]X.10.B.a - RCC North Ramp Shutdown Answer.pdf18-Dec-2022 13:31 7.2M 
[   ]X.10.C.a - RCC Steel Erection Traffic Plan Answer.pdf18-Dec-2022 13:31 7.7M 
[   ]X.11.1.a - Submittal Sec 9 Rebar Shop Drawings.pdf18-Dec-2022 13:31 1.5M 
[   ]X.11.2.a - Submittal Taxiway U Pier 1 Shops Drawings.pdf18-Dec-2022 13:31 897K 
[   ]X.11.4.1.a - RFI.pdf18-Dec-2022 13:31 508K 
[   ]X.11.4.2.a - RFI.pdf18-Dec-2022 13:31 517K 
[   ]X.2.1.a - Concrete Estimate.pdf18-Dec-2022 13:31 86K 
[   ]X.2.4.a - Pour Plan Sequence.pdf18-Dec-2022 13:31 1.0M 
[   ]X.3.1.a - GC Estimate.pdf18-Dec-2022 13:31 50K 
[   ]X.3.2.a - Staffing Matrix.pdf18-Dec-2022 13:31 74K 
[   ]X.4.2.a - Proposal Summary (Bid Tabs).pdf18-Dec-2022 13:31 122K 
[   ]X.5.A.a - Full CPM with WBS - Earliest Start Date.pdf18-Dec-2022 13:31 3.2M 
[   ]X.5.B.a - Primary Critical Path with no WBS.pdf18-Dec-2022 13:31 277K 
[   ]X.5.C.a - Full CPM with no WBS.pdf18-Dec-2022 13:31 2.9M 
[   ]X.6.1.a - Meeting Agenda.pdf18-Dec-2022 13:31 121K 
[   ]X.6.2.a - Phasing Plan.pdf18-Dec-2022 13:32 611K 
[   ]X.7.1.a - Perimeter Lighting Bulletin Analysis.pdf18-Dec-2022 13:32 7.7M 
[   ]X.7.2.a - Lighting ROM Estimate.pdf18-Dec-2022 13:32 101K 
[   ]X.7.3.a - Owner Letter.pdf18-Dec-2022 13:32 102K 
[   ]X.9.1.a - Site Utilities Map.pdf18-Dec-2022 13:32 6.7M 
[   ]X.9.3.a - Right to Excavate.pdf18-Dec-2022 13:32 120K 
[   ]X.0.0 Region 7 Commercial Problem Statement - Final.pdf21-Dec-2022 08:22 6.3M 

Apache/2.2.34 (Amazon) Server at asc67.org Port 80