Index of /ASC_Previous_Problems/R7/Commercial/2015 Region 7 Commercial Problem HP/03 Final Problem Statement/Problem Statement Final Files

[ICO]NameLast modifiedSizeDescription

[DIR]Parent Directory  -  
[   ]2015 ASC Problem Statement Add 1 FINAL 2015.01.26.docx05-Mar-2019 17:59 49K 
[DIR]X.0.1 Graphics/05-Mar-2019 17:59 -  
[DIR]X.0.2 Contract Drawings/05-Mar-2019 18:00 -  
[   ]X.0.3 Request for Information Form.xlsx05-Mar-2019 18:00 33K 
[   ]X.0.4 Competition Evaluation Form.docx05-Mar-2019 18:00 43K 
[   ]X.0.5 Sample Team Feedback Form 2014.xlsx05-Mar-2019 18:00 17K 
[   ]X.1.1 Job Purchasing Schedule Template.xls05-Mar-2019 18:00 80K 
[   ]X.1.2 Contract Amounts.pdf05-Mar-2019 18:00 102K 
[   ]X.2.1 Work Execution Plan Template.docx05-Mar-2019 18:00 40K 
[   ]X.2.2 Short Term Schedule Template.xlsx05-Mar-2019 18:00 202K 
[   ]X.3.0-Circular Opening Schedule.pdf05-Mar-2019 18:00 899K 
[   ]X.3.1 Pre-Cast Panel Estimate Template.xlsx05-Mar-2019 18:00 111K 
[   ]X.3.2 Historical Cost Data.docx05-Mar-2019 18:00 17K 
[   ]X.3.3 Casting Bed Estimate Template.xlsx05-Mar-2019 18:00 109K 
[   ]X.4.1 General Conditions Template.xlsx05-Mar-2019 18:00 36K 
[   ]X.4.2 Staffing Matrix Template.xlsx05-Mar-2019 18:00 24K 
[   ]X.4.3 Company Historical General Conditions Rates.pdf05-Mar-2019 18:00 53K 
[   ]X.4.4 Staff Position Duties.pdf05-Mar-2019 18:00 152K 
[   ]X.5.1 Bid Tab Template.xlsx05-Mar-2019 18:00 76K 
[   ]X.5.2 Contractor Proposals.pdf05-Mar-2019 18:00 1.2M 
[   ]X.7.1 Panel Design Documents .pdf05-Mar-2019 18:00 2.1M 
[   ]X.7.2 Casework Desgin Drawings.pdf05-Mar-2019 18:00 1.5M 
[   ]X.7.3 Casework Shop Drawings.pdf05-Mar-2019 18:00 2.6M 
[   ]X.9.1 Confined Spaces Plan Template.docx05-Mar-2019 18:00 69K 
[   ]X.10.1 MLPOE Phase 3 Site Plan.pdf05-Mar-2019 18:00 3.8M 
[   ]X.10.2 MLPOE Phase 4 Site Plan.pdf05-Mar-2019 18:00 3.8M 
[   ]X.10.3 Crane Technical Data.pdf05-Mar-2019 18:00 19M 
[   ]X.11.1 Glazing Sealants Submittal.pdf05-Mar-2019 18:00 554K 
[   ]X.11.2 Curtain Wall Mockup Shop Drawings.pdf05-Mar-2019 18:00 3.7M 
[   ]X.11.3 Decorative Glazing Submittal.pdf05-Mar-2019 18:00 381K 
[   ]X.11.4 QC drawings.pdf05-Mar-2019 18:00 4.1M 
[   ]X.11.5 Spec Section 08 41 23.13 -Mock up.pdf05-Mar-2019 18:00 289K 
[   ]X.11.6 Initial Inspection Checklist Template.docx05-Mar-2019 18:00 35K 
[   ]X.12.1 Completed Ceiling Areas.pdf05-Mar-2019 18:00 666K 
[   ]X.12.2 Phase 4 Completion Schedule.pdf05-Mar-2019 18:00 51K 

Apache/2.2.34 (Amazon) Server at asc67.org Port 80